Allplan tuto

broken image
broken image
broken image

If you want to switch from Allplan 2018/2019/2020 to Allplan 2021, you have three basic installation options.Īllplan 2021 is installed in a new folder. The following options are available for transferring data later: No data and settings are transferred to the new installation. Uninstall Allplan 2021 and then upgrade Allplan 2018/2019/2020. Integrating the data by hand (administrator knowledge required).Ģ. New installation with data copy from versionĪllplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. The office standard (\std), projects (\prj) and user data (\usr) can be automatically copied from an existing version 2018/2019/2020 to the new installation folder.

broken image

In this way, you can create a duplicate dataset if necessary: all projects, standards and resources can be used in both Allplan 20/2019/2020. This allows you to test the transition to the new version in real life, while the existing Allplan installation remains fully functional. Continuation of new installation with data copy from version Note, however, that this method of working should avoid parallel processing of data in both installations, as the subsequent merging is time-consuming.Ģa.

broken image